Logo

Modeling pre-assembly for floating wind farm projects off Japan's coast, 18 January 2023

Room type

Permanent

This field is required.
This field is required.
This field is required.
This field is required.
Required fields
If you have already registered and can't locate your registration confirmation email, click here!
The email address is incorrect. Please double-check your email address.

A confirmation email with logging details has been sent to the provided email.

System configuration test. Click here!

Agenda

Join in on a demonstration of how you can model pre-assembly and port logistics for floating installations in the deep waters off Japan's coast with the upgraded capabilities of the Construction Design solution.

Exclusive feature demonstration:
•Ability to model assembly at port
•Modeling for welding, mounting, bolting, and casting at the pre-assembly yard and storage area
•Installation of WTGs onto the foundation at sea / in wet dock

Ole-Erik Vestøl Endrerud

Chief Executive Officer of Shoreline Wind.